Home » Blogs » Chinaplas 2020

Chinaplas 2020

Views: 0     Author: Site Editor     Publish Time: 2024-12-26      Origin: Site

Inquire

facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
kakao sharing button
sharethis sharing button

1

At present, the construction of a new power system is a necessary move to achieve the dual-carbon goal, and it is imperative to increase the scale of renewable energy grid-connected. To this end, the "Implementation Plan" proposes specific measures to improve the adaptability of the new power system to a high proportion of renewable energy. What pain points do these specific measures point to? Liu Shiyu, assistant to the president of the General Electric Power Planning and Design Institute, pointed out in an interview with a reporter from China Energy Media that the "Implementation Plan" has put forward practical and operable policy measures to solve the problems of insufficient flexibility and insufficient adjustment capacity of the power system. It is conducive to accelerating the realization of effective and reliable replacement of fossil energy by new energy.

About Us

Zhongshan Research Mechanical Technology Co.,Ltd is specialized in LSR dosing system, located in Zhongshan city, Guangdong province.

Quick Links

Contact Us

Address: No.139, Jiefu Road, Minzhong Town, Zhongshan City, Guangdong Province
Tel: +86-760-88962007
Email: contact@zsresearch.com

Subscribe to Our Newsletter

Copyright ? 2025 Zhongshan Research Mechanical Technology Co.,Ltd. All Rights Reserved.| Sitemap.